VERNAL PIKE
Reconstruction
HARTSTRAIT ROAD TO STATE ROAD 37 - This multi-phased project
entails the reconstruction of the existing pavement,
improving drainage, and construction of sidewalk. Traffic
will be maintained throughout construction. The first phase
of the project, from Hartstrait Road to Vernal Pike, is
anticipated to be bid in September of 2006, depending
entirely on availability of Federal funds. The project is
currently under design and will be followed by Right-of-Way
acquisition. The final phase, from Vernal Pike to State Road
37, will follow in 2010.
PAVEMENT STRIPING PROGRAM
Safety
The striping program will begin in May of 2010. The
condition of the pavement markings on various roads
throughout the County will be assessed for the need to
improve the markings.
ANNUAL
BRIDGE PROJECTS
2007 Cumulative Bridge Project Report
2008 Cumulative Bridge Project Report
2009 Cumulative Bridge Project Report
You will need to download Adobe Acrobat Reader to read or
print these Reports

TRAIL PROJECTS
Karst Farm Greenway Environmental
You will need to download Adobe Acrobat Reader to read or
print this Report

Home | Back to Top | Disclaimer | Contact Us
Last updated: March 9, 2010
Home | Back to Top |
Disclaimer |
Contact Us
|